Project Name: Supply and Implementation of the Main Water, firefighting, Sewage and Irrigation networks.

  1. Client: The IRAQIA University
  2. Contractor: Al BINAA Al MOUASER for GENERAL CONTRACTING Co. Ltd.
  3. Duration: 12 Months
  4. Amount:1,666,000.00 USD

This project consist of supply and construct water and sewage networks for    Iraqi university buildings that are built on 50,000m2 area and consist of:-
The supply and construct water supply system ( including feeding lines pipes from the source that is about 2.2 km away from storage tanks ) which contain a 350m3 concrete storage tank, horizontal and submersible pumps ,valves , gauges and control boards .it also consist of supply and construct 18m diameter fountain and four 6m diameter fountains plus water pool . The sewage parts also consist of supply and construct of piping network, concrete manholes and sewage pumping station.