Project Name: Comprehensive works for mechanical and cooling systems.
  1. Client: The IRAQIA University
  2. Contractor: Al BINAA Al MOUASER for GENERAL CONTRACTING Co. Ltd.
  3. Duration: 12 Months 
  4. Amount: 4,000,000.00 USD

1-   Supply, installation and operation of five water cooled chillers( type DAIKIN ) of total cooling capacity of 2700 Ton ( 32,400,000 Btu) plus erection of required building and chilled and return water networks( carbon steel pipes with all required fittings and valves inside and outside the machines building).
2-  Cooling towers of total capacity of 2150 Ton (type Evapco) origin Belgium, pipes and fittings, electrical cables, control boards, supply, installation and commissioning.
3-  All required pumps (SPLIT CASE 411) type (Aurora) origin USA, electrical cables, control boards, supply, installation and commissioning
4-   All required softeners pipes and fittings, electrical cables, control boards, supply, installation and commissioning.
5-  Supply, installation and testing chilled water distribution network (chilled and return).